Construction Loan Calculator
Nobody hands you $250,000 on day one to build a house. The lender releases the money in stages, sends an inspector, and charges interest only on what’s been paid out so far.
That’s why the first bill is small and the next one’s bigger. It’s also why a delayed build costs more than most owner-builders expect.
This page walks through a $250,000 build with six monthly draws, so you can see exactly how the interest climbs.
What is a construction loan and how does it work?
A construction loan is short-term financing for building a home or other structure. Money comes out in stages called draws, each released as work is completed and inspected. During construction you normally pay interest only, and only on the amount drawn so far.
The structure follows from the collateral: until the building exists, the lender has little to take back. So the lender controls the cash flow, checks progress, and charges interest on a balance that grows with each draw. When the build is finished, the loan is either repaid from a separate mortgage or converts automatically into a long-term amortizing mortgage. This page uses a $250,000 build funded by six monthly draws and a three-month finish period, so you can see the interest-only math in the draw period separately from the amortizing math afterwards. Once the permanent loan starts, the mortgage calculator shows how its schedule behaves.
How to use the construction loan calculator
- Enter the construction loan amount and the interest rate during construction.
- Enter the draw / construction period as a number of payments (for monthly payments, 12 means a 12-month build).
- Enter the total term in years. This is the whole length of the schedule, including the construction period.
- Select Calculate and compare the interest-only payment with the payment that follows.
What each input means
- Construction loan amount — The total amount borrowed, assumed outstanding from the first payment.
- Interest rate during construction (APR) — The annual rate, applied to the drawn balance during construction and to the loan after conversion. One rate is used for the whole schedule.
- Draw / construction period (number of payments) — How many payments at the start are interest only. Typically 6–18 monthly payments.
- Total term, including the draw period (years) — The length of the whole schedule. The amortizing payment is sized over the payments that remain after the construction period.
- Extra amount per payment / One-time extra payment (advanced) — Additional principal that lowers the balance on which later interest is charged and brings the end of the loan forward.
- First payment date (advanced) — The date the first payment falls due. It dates each month’s interest and the month the permanent payment begins.
What the results show
The schedule starts with interest-only payments equal to the balance times the periodic rate, then switches to a higher, level payment. The summary reports the first payment, the payment after conversion, total interest and total paid, along with two charts and the full schedule.
How are interest-only payments calculated during the draw period?
Each month the interest due is the outstanding drawn balance times the monthly rate. Nothing reduces principal, so the payment rises whenever a new draw is made.
Monthly interest = drawn balance × (annual rate ÷ 12)
The result depends on when each draw lands in the month; this page assumes draws are made at the start of the month, so the new draw earns interest immediately. Lenders differ, and some charge on the average daily balance.
Worked example: $250,000 build, six draws, 8% interest-only
Inputs. Total loan $250,000 at 8%; six monthly draws of $40,000, $40,000, $50,000, $50,000, $40,000 and $30,000; then three more months to finish before conversion. The rate is illustrative.
| Month | Draw | Balance drawn | Interest due |
|---|---|---|---|
| 1 | $40,000 | $40,000 | $266.67 |
| 2 | $40,000 | $80,000 | $533.33 |
| 3 | $50,000 | $130,000 | $866.67 |
| 4 | $50,000 | $180,000 | $1,200.00 |
| 5 | $40,000 | $220,000 | $1,466.67 |
| 6 | $30,000 | $250,000 | $1,666.67 |
| 7 to 9 (each) | $0 | $250,000 | $1,666.67 |
- Month 1: 40,000 × 0.08 ÷ 12 = $266.67. Month 6: 250,000 × 0.08 ÷ 12 = $1,666.67.
- Interest in months 1 to 6: $6,000.00.
- Months 7 to 9 at the full balance: 3 × $1,666.67 = $5,000.00.
- Total interest during the 9-month build: $11,000.00.
- If interest had been charged on the full $250,000 from day one, the nine months would cost $15,000.00; staged draws saved $4,000.00.
How do draws affect the interest I pay?
Because interest follows the drawn balance, slow, late draws cost less than fast, early ones, but delays stretch the schedule and raise other costs. Build periods commonly run on the order of months to about a year, depending on the project and lender, and many loans set a maximum term after which the loan must convert or be repaid. In the example, shifting $40,000 from month 6 into month 1 would raise month-by-month interest, so the pace of the build matters as much as the rate. Delays also matter after the draws finish, since the full balance keeps accruing interest, which is why months 7 to 9 each cost $1,666.67.
I always tell owner-builders to ask for the draw schedule in writing before closing. Lenders inspect the work before they release funds, so a missed inspection can freeze a draw while your subcontractor waits.
What happens when the loan converts to a mortgage?
At completion the interest-only phase ends, and the balance is repaid over a long amortizing term. This can happen in two ways, described under a later heading. The payment jumps, because principal now has to be repaid as well. On $250,000 at 8%, the interest-only payment is $1,666.67, while a 30-year amortizing payment is $1,834.41, a jump of $167.74. A single-structure model that spends 12 months interest-only inside a 30-year term pays $1,666.67 for a year and then $1,849.86 for the remaining 348 months, with total interest of $413,757.94, compared with $410,390.22 for a standard schedule with no interest-only period.
What is a construction-to-permanent loan?
A construction-to-permanent loan is a single loan with one closing that covers the build and then converts to a long-term mortgage. Its advantage is one set of closing costs and no need to qualify again at the end. Its drawback is that the permanent rate may be set or locked at the start, which can look worse or better later, and your choices of permanent lender are limited. The alternative is a stand-alone construction loan followed by a separate mortgage; it allows shopping for the permanent loan but means two closings and a second approval at a time when you may be stretched.
How does the permanent loan rate affect project cost?
The permanent loan usually costs far more in interest than the build period. On $250,000 over 30 years:
| Rate | Monthly payment | Total interest over 30 years |
|---|---|---|
| 6.50% | $1,580.17 | $318,861.58 |
| 7.00% | $1,663.26 | $348,769.07 |
| 8.00% | $1,834.41 | $410,390.22 |
Compared with about $11,000.00 of construction-period interest, the permanent loan’s interest is 32 times larger at 7%. So the permanent rate and term deserve as much attention as the construction rate. Half a point shifts the payment by about $83.09 a month.
What costs should I budget beyond interest during construction?
Budget for items the loan may not fully cover: land if not already owned, permits and impact fees, utility connections, site work, architect and engineering fees, builder’s risk insurance, lender inspection fees for each draw, appraisal, closing costs, and a contingency reserve for overruns, often set at a meaningful percentage of the build cost. Also carry your current housing cost, since you may pay rent or an existing mortgage while the new home is built. Interest during construction is itself a cost: in the example it’s $11,000.00, which must be paid from savings or built into the loan as an interest reserve.
What risks are unique to construction loans?
The main risks are cost overruns, delays, builder problems, and a valuation that comes in below cost, which can leave a gap you must fund. Interest accrues while delays continue. If the loan has a fixed maturity for construction, missing it can force an extension fee or a rushed refinance. Rates may also change between the start of the build and the time a separate permanent loan is arranged. Lenders manage some of this with inspections, a cap on draws and requirements for a licensed builder, but you carry the exposure.
A couple building on rural land outside Nashville is likely to learn what many owner-builders learn: delays cost you twice. At the example’s 8% on $250,000, every extra month at the full balance is another $1,666.67 of interest, and a rate lock on the permanent loan may run out before the roof is on.
What should I compare between construction loan offers?
Compare interest rate and how it’s applied (drawn balance or average daily balance), fees per draw and inspection costs, the construction term and any extension fees, whether the loan converts automatically, the permanent rate and whether it’s locked, qualification and down payment requirements, contingency rules, and any interest reserve. Compare total cost, not only the construction-period rate.
What should I verify before closing a construction loan?
Must-dos
Model the permanent payment before you start building
The interest-only payments during construction are far smaller than the amortizing payment that follows, and many borrowers are surprised by the jump. Use the conversion section to estimate the permanent payment and check it against your budget at several rates, with the permanent rate table as a guide. If the figure is uncomfortable, adjust the size of the project now, when it’s cheap to do so.
Decide how the loan will end before you close it
Know whether the loan converts automatically to a permanent mortgage or whether you must arrange a separate one, and by what date. Missing the deadline can bring extension fees or force a rushed refinance when you’re stretched. The construction-to-permanent section compares the two structures. Keep a backup plan in case approval is delayed.
Understand how draws, inspections and overruns are handled
Ask how each draw is requested, how long inspections take, what each one costs and what happens if the budget is exceeded. Slow draws can leave contractors unpaid and stall the build. Clarify who covers overruns and whether the lender requires you to add cash before releasing more funds. Good communication with the builder and the lender prevents expensive delays.
Keep a separate contingency reserve
Cost increases, design changes and weather delays are normal in construction, and interest keeps accruing while you wait. Hold a reserve on top of the loan so that a modest overrun doesn’t stop the project, and review the budget every month. The risks section lists the problems that most often drain budgets. A reserve costs little compared with a stalled build.
Must-nots
Do not assume the interest-only phase will continue
The construction period has a fixed end, and after it the payment rises because principal must be repaid. Delays that push you past the deadline can add fees or force a refinance on poor terms. Confirm the dates in the contract and plan around them, using the conversion section. Treat the interest-only payment as temporary.
Do not ignore the size of the payment jump at conversion
On the example loan, the amortizing payment is about $170 a month above the final interest-only payment, and a budget built on the smaller figure may not survive the change. Test affordability using the permanent numbers, and use the mortgage calculator for the full schedule of the long-term loan. Include taxes and insurance, which also start at completion. Plan for the higher cost from day one.
Do not start building without adequate cash reserves
Overruns and delays are common, and interest accrues on the whole drawn balance while you wait. Without a reserve, a small problem can leave you unable to pay a draw fee or a contractor. Set aside enough for several months of payments and some extra cost, and review the other costs section. Reserves are cheaper than emergency borrowing.
Do not use the calculator as a quote or an approval
Real construction loans differ in how interest is calculated, how draws are fed and what fees apply. The calculator estimates costs from a simple schedule at one rate, so it can’t replace a lender's disclosure. Use it to compare scenarios and plan, then get full terms in writing. Don’t sign a building contract on the strength of an estimate.
Key construction loan terms
- Draw
- A draw is a release of loan funds to pay for a stage of construction, usually after an inspection confirms the work is complete. Interest accrues only on the amount drawn so far, which is why payments rise over time, as the worked example shows month by month. Lenders may charge an inspection fee for each draw. Delays in drawing can slow the build.
- Interest reserve
- An interest reserve is money set aside within the loan to pay interest during construction, so you do not have to find cash each month. It increases the loan amount and the interest charged. It can ease cash flow, but it must be sized for delays. Ask whether your lender offers one and how it is calculated.
- Conversion
- Conversion is the change from the construction phase to a permanent amortizing mortgage, either automatically or by refinancing. The payment normally rises because principal must now be repaid, as the conversion section illustrates. Check the deadline and any extension fees. Confirm that you can afford the permanent payment, not just the interest-only one.
- Contingency
- A contingency is a reserve set aside for unexpected construction costs, such as material price increases, design changes, soil problems or weather delays. Overruns are common enough that lenders and builders usually recommend one, often as a percentage of the build cost. Without it you may have to find cash mid-project or stop work while interest keeps accruing. The other costs section lists items to include in the budget.
- Builder's risk insurance
- Builder's risk insurance covers a structure while it is being built, protecting against damage such as fire, theft or storms before it is complete. Lenders usually require it, and standard homeowners insurance does not apply until the home is finished. Premiums vary with the project. Include it in your budget and confirm who is responsible for it.
How do construction loans differ in the US, Canada and the UK?
“Construction loan” means a slightly different thing in each country.
United States. One-time close (construction-to-permanent) and two-close structures exist, with staged draws and inspections; the CFPB’s mortgage materials explain general disclosure rules. One-time close can save you a second round of closing costs, but compare the rate-lock terms carefully.
Canada. Builders and owner-builders typically use progress advances against a mortgage, with holdbacks tied to stages and payment of interest on advanced amounts; the Financial Consumer Agency of Canada explains mortgage basics. If you’re building in Canada, ask what’s held back at each stage and when it’s released.
United Kingdom. Self-build mortgages release funds in stages, sometimes in arrears after each stage is completed, and are regulated by the FCA; MoneyHelper offers guidance. Because funds often arrive after each stage is finished, you may need cash or a bridging arrangement to pay the builder up front.
Terminology and staging differ, so confirm with the lender.
What does this construction loan calculator leave out?
It separates an interest-only phase from an amortizing phase at a single fixed rate. It does not model variable rates during the build, draw fees, uneven draw timing within a month, interest reserves, cost overruns or a different rate for the permanent loan unless you enter it separately. Results are estimates.
Before you break ground
Model the permanent loan in the mortgage calculator, study payment resets in the interest-only loan calculator, check the loan size you can carry with the affordability calculator, or run any other fixed-rate loan through the custom loan calculator.
Then do a quick reality check. Add a few extra months at the full balance to the calculator above and see whether you can still carry the payment. Ask your lender for the draw schedule and the permanent-loan terms in writing before the first shovel goes in.
Construction Loan Calculator FAQs
Do I pay interest on the whole construction loan from day one?
Usually not. Interest accrues on the amount drawn so far. In the example, month 1 interest is only $266.67 because $40,000 has been drawn.
Why does my payment go up each month during construction?
Each draw adds to the balance, and interest-only payments follow the balance. The payment stops rising once the loan is fully drawn.
What happens at the end of the build?
The loan converts to a permanent mortgage or you repay it with a new loan. The payment normally rises because principal must now be repaid.
Can I use this for a construction-to-permanent loan?
Yes, by entering an interest-only period followed by the amortizing term. Confirm the actual permanent rate with your lender.
How much contingency should I keep?
There is no universal figure, but overruns are common enough that lenders and builders usually recommend a reserve. Ask your builder and lender.
Does this calculator include fees and inspections?
Only if you add them as costs. Lenders may charge fees per draw, appraisal costs and closing costs that should be budgeted separately.
What does this calculator not include?
It leaves out variable rates, cost overruns, delays, taxes, and approval. Verify the lender's terms before relying on it.
Primary sources and further reading
- Consumer Financial Protection Bureau (CFPB), mortgage and loan options materials.
- Financial Consumer Agency of Canada (FCAC), mortgage resources.
- MoneyHelper and the Financial Conduct Authority (UK), self-build mortgage guidance.
- Standard interest-only and level-payment mathematics.
Official pages you can open directly:
This page is educational and is not financial, legal or tax advice; confirm every figure with your lender or a qualified professional.